RISER FLANGE |
|
|
BELLOWS |
|
|
FLANGE COMPRESSION RING |
|
|
(6) 1/4"-20 BOLTS |
|
|
SURFACE RING |
|
|
DRAIN VALVE ASSEMBLY |

|
|
TO FIGURE THE RISER LENGTH, TAKE THE DIMENSIONS ABOVE AND SUBTRACT FROM THE TOP OF THE TANK. CNI RECOMMENDS 1"-2" ABOVE GRADE. |
|
|
TAKE THE RISER FLANGE-(A) AND TIGHTEN TO RISER. |
|
|
OUT OF THE BOX REMOVE THE FLANGE COMPRESSION RING-(C). |
|
|
NOW LAY THE COMPRESSION RING-(C) IN PLACE AND SCREW THE 1/4"-20 BOLTS-(D) ALTERNATING BACK AND FORTH TIGHTENING EACH TIME. |
|
|
TAKE THE BELLOWS-(B) AND SIT ON FLANGE-(A). MAKE SURE THE "O"-RING IS NOT SHOWING. |
|
|
BACK FILL UP TO THE NECK OF THE BELLOWS-(B), PLUMB AT THAT POINT AND ATTACH THE SURFACE RING-(E). |
|
|
NOW YOU CAN SET THE CONTAINMENT IN PLACE AND PLUMB. |
|
|
SCREW DOWN DRAIN VALVE ASSEMBLY-(F) UNTIL IT SEATS ON "O"-RING. |
|
|
CONCRETE UP TO THE TOP OF THE LIP ON THE SURFACE RING-(E). |
Home |
Back |
|
Part 2 |
Order |
|---|